Something New From Old

$200.00

Something New From Old

This course examines the special planning considerations related to the design, construction, and commissioning of replacement equipment or newly installed unit operations at an existing industrial wastewater treatment facility. Course material will focus on space constraints, timing and sequencing of demo/installs, communications, and maintaining operational continuity. Three case studies will be presented including (2) refinery wastewater system retrofits and a face-lift for an aging railyard wastewater plant.

2.5 TCHs. $200