Do I Still Need to Conduct A Stormwater Annual Comprehensive Inspection?

CAPACCIO recently received questions related to the Stormwater Annual Comprehensive Inspection (ACI) which is a requirement under the 2008 Multi-Sector General Permit (MSGP). Specifically permitees wanted to know if they had to conduct the ACI on or before September 29 and also submit the report this year.

We developed this flow diagram to help companies determine if they have to conduct and submit a Stormwater ACI report.

http://www.capaccio.com/handouts/Inspection_requirements.pdf

Please contact Chris Walton at cwalton@capaccio.com or at 508.970.0033 ext. 139 if you need further clarification.

#StormwaterAnnualComprehensiveInspectionACI #StormwaterACIReport #Stormwater #USEPA #MSGP

2 views
Cap_logo.jpeg
  • Twitter - Black Circle
  • LinkedIn - Black Circle
Contact Us
Contact
Useful Links

290 Donald Lynch Blvd
Marlborough, MA 01752

BBB.png
WBE_Logo.png
Marlborough Chamber logo.jpg

Voice: (508) 970-0033

Fax: (508) 970-0028

© 2020 Capaccio Environmental Engineering, Inc.